Payment, valuation, variations, retention and the final account. 174 pieces, no sign-up, and no piece that ends in a sales pitch.

Latest

Audit trail18/12/2025
Site photos and diaries: what actually counts as evidence?

Disputes are decided on records made at the time, by someone who was there, with a date attached. What makes a photo, a diary or an email usable a year later, the reconstructed records that fail, and the ten-minute daily habit that wins arguments you have not had yet.

Read now
Variations16/12/2025
What is a provisional sum, and what happens when the real work shows up?

A provisional sum is an allowance for work nobody could define at tender: the drains until the ground is opened, the rot until the floor comes up. When the work firms up it is valued like a variation, and whether you also get time depends on one word: defined.

Read now
Subcontractors13/12/2025
When subcontract payment dates do not match the main contract

Two contracts, two timetables, and a main contractor in between funding the difference. How the gap arises, how large it gets, and what can be done at procurement.

Read now
Construction Act11/12/2025
The job is finished and the client has gone quiet. What do I do?

Silence after handover is a strategy, and it works on builders who chase by text message. The ladder that beats it: one letter with a schedule, a real deadline, and a named next step, with the route depending on who your client is.

Read now
Variations08/12/2025
Who on site is actually allowed to instruct extra work?

Your contract names who can give an instruction that binds the client. Everyone else on site is giving you a request. How to tell the difference, and the one-line email that converts one into the other.

Read now
Time & completion04/12/2025
The client says the work is faulty but will not let me back in to fix it

A client who claims defects and refuses access is running the weakest version of their own claim. Why your right to return matters, what refusing it does to the money they can recover, and the two dated letters that put the refusal on the record.

Read now
Construction Act01/12/2025
What are the payment terms in a building contract?

Four dates in a fixed order: due date, payment notice, pay less notice, final date for payment. Who sets each one, what fills the gap when the contract is silent, and which of them bind on your job.

Read now
Reports28/11/2025
How do I take off quantities from drawings without missing half the job?

Taking off is not measuring, it is measuring in a system: one pass per trade, a consistent order through the building, everything written where the next person can check it. The method surveyors use, scaled to a kitchen table.

Read now
Construction Act26/11/2025
The client has disappeared mid-job. What do I do with the site?

Calls unanswered, valuations unpaid, and you are halfway through their building. The order of moves that protects you: stop increasing your exposure, suspend properly rather than walk, record the state of the works, and find out what kind of disappearance this is.